5-1. Kitchen Counter Tops Built 
5-2. Main Bathroom 
5-3. Master Bathroom 
5-4. Gutters & Downspouts 
5-5. Downspouts around the corner 
5-6. Downspouts into the tank 
5-7. Four Downspouts into the tanks 
5-8. Septic Tank Lids Poured 
5-9. Block walls for septic tank lids 
5-10. Setting Septic Tank Lids 
5-11. The Lid-Setting Crew 
5-12. Working on the nosing & backsplash 
5-13. Nosing & Backsplash Done 
5-14. Sink Installed (ready for plumber) 
5-15. Kitchen Counter Tops Done 
5-16. Drain Pipe in the leach bed 
5-17. The work crew covering up the drain field 
5-18. End Paneling on the Cabinets 
5-19. The window trim being painted 
5-20. All the Flooring (In the House!)