1 Jobsite Prepared & Ready 
2 Water Tank Base Poured 
3 Outlet & Drain Lines Installed 
4 Drain Line Extended 
5 Water Tank Taking Shape 
6 Sifting Sand for Mortar 
7 Mixing Concrete to Fill Block Cores 
8 Block Work Finished 
9 Plastering the Inside Walls 
10 More Inside Walls Plastered 
11 Build Wood ‘Saddles’ for the Scaffolding 
12 Scaffolding (with Saddles) & Joists in the Tank 
13 Scaffolding & Joists Set in One Side 
14 Scaffolding in the Other Side Too 
15 Plastering on the Outside Walls 
16 Plywood Decking for Concrete Top with Access to Inside 
17 Most of the Decking for the Concrete Lid 
18 Forms on the Outside Edge of Tank Top 
19 Outside Forms Anchored to Rebar in Cores 
20 Forms around Access Holes in Water Tank Top 
21 Top Formed with Double Steel Mat Reinforcing 
22 Mixing the Concrete for the Top 
23 Pouring the Concrete Top 
24 Masons Finishing the Concrete Top 
25 Bill – on the Jobsite