7-24. Materials Stacked Under House to Dry 
7-24. Walls Laid Out – Ready to Build 
7-25. Back Porch Framed 
7-28. Back Porch w Steps – Access to House 
7-29. WT2 Walls Framed & Rough Electrical 
7-31. WT2 Ceiling Paneling 
7-31. WT2 Kitchen Cabinets w note from the Assemblers 
8-1. WT2 Back Porch Deck & Steps 
8-2. WT2 Septic Tank Set & Drain Line 
8-2. WT2 Trenches for Leach Bed 
8-3. WT2 A Bathtub Set 
8-3. WT2 Footer Being Poured around Septic Tank 
8-3. WT2 Rough Plumbing 
8-4. WT2 A Bedroom Paneled & Painted 
8-4. WT2 Hallway Paneled & Painted w Back of Electrical Box in Hall Closet 
8-5. WT2 First Kitchen Wall Cabinets 
8-5. WT2 Master Bath & Shower 
8-5. WT2 More Kitchen Cabinets 
8-5. WT2 Plumbing for Main Bathtub & Shower 
8-7. WT2 Water Tanks Set in Place